摘要
结合海南东环客专万宁制梁场的建设经验,介绍了客专纵列式制梁场规划的原则,重点阐述了根据工期任务、制梁工序、运架一体化等原则的工装设备配置方法和平面布置形式,为正在进行的客专施工中制梁场的建设提供指导。
Unifying with the construction experiences of Hainan east ring passenger dedicated line Wanning prefabricating girders plant,this article introduces planning principles of passenger dedicated lines longitudinal beam plant,and focuses on tooling equipment allocation methods and plane layout forms according to construction schedule,prefabricating girders procedures,and integration of transportation and lifting,etc..Thus,it has provided guidance for the construction of in-building passenger dedicated line prefabricating girders plant.
出处
《山西建筑》
2010年第32期134-135,共2页
Shanxi Architecture
关键词
客运专线
制梁场
规划
平面布置
passenger dedicated lines
prefabricating girders plant
planning
plane layout