海南东环客专万宁制梁场施工实践与探讨

Construction practice and exploration on Hainan east ring passenger dedicated line Wanning prefabricating girders plant
下载PDF
导出
摘要 结合海南东环客专万宁制梁场的建设经验,介绍了客专纵列式制梁场规划的原则,重点阐述了根据工期任务、制梁工序、运架一体化等原则的工装设备配置方法和平面布置形式,为正在进行的客专施工中制梁场的建设提供指导。 Unifying with the construction experiences of Hainan east ring passenger dedicated line Wanning prefabricating girders plant,this article introduces planning principles of passenger dedicated lines longitudinal beam plant,and focuses on tooling equipment allocation methods and plane layout forms according to construction schedule,prefabricating girders procedures,and integration of transportation and lifting,etc..Thus,it has provided guidance for the construction of in-building passenger dedicated line prefabricating girders plant.
作者 张标
出处 《山西建筑》 2010年第32期134-135,共2页 Shanxi Architecture
关键词 客运专线 制梁场 规划 平面布置 passenger dedicated lines prefabricating girders plant planning plane layout
  • 相关文献

参考文献5

二级参考文献20

  • 1姜丽雯.铁路客运专线预制梁场的规划设计研究[J].铁道标准设计,2007,27(6):8-12. 被引量:41
  • 2李艳哲,冯广胜.京津城际轨道交通工程3号梁场总体设计与箱梁施工[J].铁道标准设计,2007,27(6):15-18. 被引量:5
  • 3陈秀方.无缝线路稳定性问题的最小温度力[J].铁道工务,1989,(4).
  • 4要文堂.武广客运专线XJDⅠ标梁场的建设[J].铁道标准设计,2007,27(9):1-4. 被引量:8
  • 5秦沈客运专线技术总结编委会.秦沈客运专线技术总结[R].,2003..
  • 6卢耀荣.无缝线路稳定性安全储备量分析[A]..铁道部科学研究院论文集第三集(铁路轨道)[C].北京:中国铁道出版社,1990..
  • 7铁道部铁路秦沈客运专线工程初验委员会,秦沈客运专线工程初验报告[R].北京:铁道部建设司,2002.The preliminary committee of the Qinhuangdao-Shenyang passenger special line project of the Ministry of Railway. Preliminary Inspection for the Qinhuangdao-Shenyang Passenger Special Line Project[R]. Beijing: The Construction of the Minsistry of Railway, 2002.
  • 8铁道科学研究院.软土路基工后沉降的控制研究报告[R]. 北京:铁道部建设司,2003.CARS. Report of Control and Research about the Settlement after Construction of Soft Soil Railroad Foundation [R]. Beijing:The Construction of the Minsistry of Railway, 2003.
  • 9Kishand A, Mui W. A brief synopsis on the track lateral shift problem[J]. AREA Bulletin, 1994, (746) :155-167.
  • 10Samavedom G, Akish D Jeong. Experimental Investigation of Dynamic Buckling of CWR Tracks[R]. Trans portation Systems Center Cambridge MA02142. PB 87-1.

共引文献25

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部