针对某高速公路取土场原位电渗处治过湿填料的施工方法进行了介绍,分别阐述了在取土场原位电渗处治过湿填料的施工设备、材料及其施工要点等内容,为电渗技术的进一步推广奠定了基础。
The paper introduces the construction method to treat the over-wet filler with insitu electricity in borrow areas on some expressway,illustrates the construction equipment,the materials and the construction contents of the insitu electricity treatment for the over-wet filler in borrow areas,so as to lay the foundation for the further extended application of the electroosmosis.