通过对总分包方式发展现状的讨论,根据我国现状,以民用建筑为例,对图纸管理、方案管理、洽商管理、测量管理、试验管理、质量管理、资料管理及各种技术管理制度进行了分析,以期指导建筑施工企业建立适合自身情况的总分包管理办法。
According to the discussion on the development of the general and sub-contract pattern, the paper according to the current status in China, analyzes from the graphic management, the scheme management, the business management, the measurement management, the experi- menta/management, quality management, data management and all kinds of technical management system by taking the civil building as the ex- ample, so as to direct the construction enterprises to establish their own general and sub-contract management method.
出处
《山西建筑》
2010年第33期207-208,共2页
Shanxi Architecture
关键词
项目管理
总分包
质量管理
管理制度
program management, general and sub-contract, quality management, management system