摘要
针对基康(Geokon)多点位移计在山西省万家寨引黄工程北干线煤矿采空区中的应用进行了介绍,分别阐述了仪器选型,多点位移计的安装埋设方法等内容,并对仪器设备施工提出了看法和建议,对同类工程具有一定指导意义。
This article introduces the application of Geokon multiple position extensometer in north line mined-out region of Shanxi Wanjiazhai yellow river diversion project, respectively expounds the instrument selection and installation-embedding method of multiple position extensometer, and then puts forward views and suggestions for equipment construction. Therefore, it has certain guiding significance for similar engineering.
出处
《山西建筑》
2010年第33期341-342,共2页
Shanxi Architecture
关键词
多点位移计
采空区
监测仪器
埋设方法
multiple position extensometer, mined-out area, monitoring equipment, embedding method