CPR1000主给水泵设计输入选择及裕量取值分析 被引量:2

Design Input Selection and Surplus Quantity Value of Main Water Supply Pump in PR1000
下载PDF
导出
摘要 根据CPR1000核电厂的特点,对常规岛主给水泵设计输入进行了分析,指出应选择一回路最佳估算流量下的接口参数为设计输入,给水泵的流量裕量取值为5%、阻力裕量取值为10%能够满足电厂最大连续出力运行要求,并具有良好的经济性。 Based on the feature of CPR1000 nuclear power plant,the purpose of the paper is to analyze the design input and margin selection of main feedwater pump in turbine hall,and it is found that the interface parameters between nuclear island and conventional island under best estimate condition shall be used as input data for the selection calculation of main feedwater pump parameters,while the pump shall consider 5% margin for flow-rate and 10% margin for resistance calculation,the result of selection calculation based on the above condition can fully meet the long term operation requirement,besides,from the point of view of investment,the result is also economical.
作者 胡友情
出处 《电力勘测设计》 2010年第5期65-68,共4页 Electric Power Survey & Design
关键词 CPR1000 主给水泵 参数选择 设计裕量 CPR1000 main feedwater pump parameter selection design margin.
  • 相关文献

参考文献3

二级参考文献3

共引文献138

同被引文献7

引证文献2

二级引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部