期刊文献+

多级多层备件供应链需求建模与仿真 被引量:19

Multi-indenture multi-echelon spare part supply chain requirement modeling and simulation
下载PDF
导出
摘要 为提高大型复杂装备的备件满足率,降低企业备件服务费用,在对多级多层备件需求特点进行分析的基础上,提出了多级多层备件供应链需求仿真建模方法,给出了修复性维修活动备件需求仿真模型和预防性维修活动备件需求仿真模型,通过一次抽样就可以确定可修产品的一级备件需求。在确定备件需求的基础上给出了备件费用估算方法。构建了多级多层备件供应链备件需求确定的仿真算法,可以对多级多层备件供应链的备件需求进行仿真计算。通过某型IT设备多级多层备件需求仿真计算案例,得出了该设备在规定时间内多级多层备件需求量仿真结果,验证了模型的可行性和合理性。 Improving spare part fill rates of complicated hierarchic equipment and reducing enterprise spare part cost were significant for Multi-Indenture Multi-Echelon(MIME)spare part supply chain.Supply chain requirement simulation modeling method of MIME spare part was proposed,and the simulation models for spare part quantity in corrective maintenance activities and preventive maintenance were proposed.Thereby,spare part quantity required in maintenance activities was calculated according to sampling only one time in the first supply chain echelon.Spare part cost calculation method was presented in accordance with spare part quantity.MIME spare part supply chain requirement simulation algorithm was established.A MIME spare part numeral example of IT equipment was given.According to simulation calculation,the MIME spare part quantities were obtained within a given period,and the feasibility and rationality of the simulation models were validated.
出处 《计算机集成制造系统》 EI CSCD 北大核心 2010年第10期2038-2043,共6页 Computer Integrated Manufacturing Systems
关键词 多级多层 备件 供应链 建模 仿真 可靠性 multi-indenture multi-echelon spare part supply chains modeling simulation reliability
  • 相关文献

参考文献14

  • 1SHERBROOKE C C. Optimal inventory modeling of systems: multi-echelon technques[M]. London, UK. : Kluwer Academic Publishers, 2004 : 48-53.
  • 2SHERBROOKE C C. Using sorties vs. flying hours to predict aircraft spares demand[R]. Washington, D. C. , USA: Logistics Management Institute Report, AF501LN1,1997.
  • 3WONG H, VAN HOUTUM G J, CATTRYSSE D. Multi-item spare paris systems with lateral transshipments and waiting time constraints[J].European Journal of Operational Research,2006,171(3):1071- 1093.
  • 4SPANJERS L, VAN OMMEREN J C W, ZIJM W H M. Closed loop two-echelon repairable item systems[J]. OR Spectrum,2005,27(2/3) :369-98.
  • 5SLEPTCHENKO A, VAN DER HEIJDEN, VAN HARTEN M A. Trade-off between inventory and repair capacity in spare part networks[J]. Journal of the Operational Research Society,2003,54(3) :263 272.
  • 6STEFANOVIC D, STEFANOVIC N, RADENKOVIC B. Supply network modelling and simulation methodology[J]. Simulation Modelling Practice and Theory, 2009, 17 ( 4 ):743-766.
  • 7ROSSETTI M D, MIMAN M, VIJITH V. An object-oriented framework for simulating multi-echelon inventory systems[C]//Proceedings of the 2006 Winter Simulation Conference. New York, N.Y., USA:ACM, 2006:1452-1461.
  • 8ZAMPERINI M B, FREIMER M. A simulation analysis ot the vari-metric repairable inventory optimization procedure for the U.S. coast guard[C]//Proeeedings of the 2005 Winter Simulation Conference. New York, N. Y. , USA: ACM, 2005: 1692-1698.
  • 9张衡,花兴来,许绍杰.可修复备件系统库存决策仿真优化模型[J].系统工程与电子技术,2009,31(6):1510-1514. 被引量:14
  • 10杨宇航,赵建民,李志忠,郑力.备件管理系统仿真研究[J].系统仿真学报,2004,16(5):981-986. 被引量:36

二级参考文献39

  • 1杨宇航,赵建民,李志忠,郑力.备件管理系统仿真研究[J].系统仿真学报,2004,16(5):981-986. 被引量:36
  • 2尤建新,隋明刚,杜娟.闭环供应链中可修理库存优化模型与算法[J].同济大学学报(自然科学版),2004,32(11):1534-1539. 被引量:5
  • 3章文晋,康锐,郭霖翰,李瑞莹.装备保障建模仿真研究(英文)[J].Chinese Journal of Aeronautics,2005,18(2):142-146. 被引量:15
  • 4范浩,贾希胜,贾云献,王亚彬.基于遗传算法的备件两级优化建模与仿真研究[J].系统工程与电子技术,2006,28(1):150-152. 被引量:20
  • 5Chung Shu-Hsing, Kang He Yau, Pearn W L. A service level model for the control wafers safety inventory problem[J].The International Journal of Advanced Manufacturing Technology,2005,26(5) :591 - 597.
  • 6Axsater S. Scaling down multi-echelon inventory problems[J]. Int J Production Economics, 2001(71) :255 - Z61.
  • 7IMRED. Optimal production inventory strategies for a HMMS type reverse logistics system[J]. International Journal of Production Economics, 2003,81 : 351 - 360.
  • 8Hausman W H,Scudder G D. Priority scheduling rules for repairable inventory systems[J].Management Science,1982,28:1251 - 1232.
  • 9Towill D R. Supply chain dynamics[J].International Journal of Computer Integrated Manufacturing, 1991,4(4) : 197 - 208.
  • 10Wikner J,Towill D R,Naim M M. Smoothing supply chain dynamics[J]. International Journal of Production Economics, 1991,22(3):231 - 248.

共引文献73

同被引文献192

引证文献19

二级引证文献35

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部