期刊文献+

考虑备件随机折损的备件订货与设备维修策略 被引量:5

Replenishment and equipment maintenance policices considering stochastic spare parts deterioration
下载PDF
导出
摘要 为研究随机的备件库存管理与设备维修问题,提出了按照设备重要性对故障设备进行分类,并将备件库存在各级故障设备之间进行分配的设备维修策略。通过构建动态规划模型,得出最优备件补货策略和设备维修策略,给出为各级设备提供即时维修的动态备件库存临界点。通过算例将该策略同先出现故障先维修策略进行比较,结果表明该策略能显著降低设备维护费用,减少备件折损损失。 To study spare parts inventory management and equipment maintenance problem,in which both equipment failure and the lifecycle of the spare parts were stochastic.Equipment classification method according to its importance was proposed,and a maintenance policy with inventory allocation policy was put forward among different types of faulty equipment in which backorder was allowed for sustaining production in safe and efficient way.Through constructing dynamic programming model,the optimal spare parts inventory policy and equipment maintenance policy with the optimal time-based critical inventory level for each class was derived.Finally,numerical analysis was provided.Comparing to first-come-first-served maintenance policy,the proposed policy could significantly reduce the equipment maintenance cost and reduce the loss caused by spare parts deterioration.
出处 《计算机集成制造系统》 EI CSCD 北大核心 2010年第10期2129-2138,共10页 Computer Integrated Manufacturing Systems
基金 国家自然科学基金资助项目(70672039)~~
关键词 备件 随机折损 设备维修 库存分配 补货 spare parts stochastic deterioration equipment maintenance inventory allocation replenishment
  • 相关文献

参考文献13

  • 1VEINOTT A F J R. Optimal policy for a multi-product, dy namic, nonstationary inventory problem[J]. Management Science, 1965,12(3) :206-222.
  • 2DEKKER R, KLEIJN M J, DE ROOIJ P J. A spare parts stocking policy based on equipment criticality[J]. International Journal of Production Economics,1998,56 57(20) :69- 77.
  • 3LEVENT KOCA GA Y, SENA. Spare parts inventory man agement with demand lead times and rationing[J].IIE Transactions, 2007,39(9) :879-898.
  • 4CHANGPL, CHOUYC, HUANG M G. A (r, r, Q) inventory model for spare parts involving equipment criticality[J].International Journal of Production Economics, 2005,97(1):66-74.
  • 5KENNEDY W J, WAYNE P J, FREDENDALL L D. An overview of recent literature on spare parts inventories[J]. International Journal of Production Economics, 2002,76(2) : 201- 215.
  • 6CAVALIERI S, GARETTI M, MACCHI M, et al. A decision-making framework for managing maintenance spare parts [J Production Planning & Control, 2008,19(4):379-396.
  • 7GHARE P M, SCHRADER G F. A model for exponentially decaying inventory [J]. Journal of Industrial Engineering, 1963,14(5) :238-243.
  • 8ABAD P L. Optimal pricing and lot-sizing under conditions of perishability and partial backordering[J]. Management Science,1996,42(8) :1093 -1104.
  • 9SIVAKUMAR B. A perishable inventory system with retrial demands and a finite population[J]. Journal of Computational and Applied Mat hematies, 2009,224 (1) : 29-38.
  • 10GOYAL S K, GIRI B C. The production-inventory problem of a product with time varying demand, production and deterioration rates [J ]. European Journal of Operational Research,2003,147(3) :549-557.

同被引文献28

  • 1徐晓燕.一种基于需求特性分类的备件库存管理方法及其实证研究[J].系统工程理论与实践,2006,26(2):62-67. 被引量:42
  • 2包兴,季建华,连海佳.核心备件的订货策略与模型[J].上海交通大学学报,2007,41(7):1097-1101. 被引量:13
  • 3SHERBROOKE C C. VARI-METRIC: Improved approxima- tions for multi-indenture multi-echelon availability models]-J3. Operations Research, 1986,34 (2) : 311-319.
  • 4SHERBROOKE C C. Metric:a multi-echelon technique for re- coverable item control[J]. Operations Research, 1968,16(1): 122-141.
  • 5SHERBROOKE C C. Optimal inventory modeling of system: multi-echelon techniques [J]- 2nd ed. Boston, Mass. , USA: Artech House, 2004 : 197-206.
  • 6WONG H, HOUTUM V G J, CATTRYSSE D, et al. Multi- item spare parts systems with lateral transshipments and wait- ing time constraints[J]. European Journal of Operational Re- search, 2006,171 (3) : 1071-1093.
  • 7SELCUK 13. An adaptive base stock policy for repairable item inventory control[J]. International Journal of Production Eco- nomics, 2013,143 (2) : 304-315.
  • 8ISAACSON E, BOREN M. Dyna-metric version6 an ad- vanced capability assessment model[R]. Santa Monica, Cal. , USA: RAND Corporation, 1993.
  • 9PYKE D F. Priority repair and dispatch policies for repairable i- tem logistics systems[J]. Naval Re Ixgist, 1990,37 (1) : 1-30.
  • 10MILLER B L, ABELL J 13. DRIVE(distribution and repair in variable environments) : design and operation of the ogden proto- type[R]. Santa Monica, Cal. , USA: RAND Corporation, 1992.

引证文献5

二级引证文献13

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部