全煤巷矿井建设期应用水平煤仓技术经济分析 被引量:1

The Technical-Economic Analysis of the Horizontal Coal Bin in Constructing All Coal Heading Mine
下载PDF
导出
摘要 单层化、全煤巷布置矿井可以缩短建井周期、降低成本、适于机械化作业,但综掘机后配套运输影响其掘进效率。本文提出用水平机械煤仓作为缓冲煤仓来解决此问题,并结合实例进行技术经济分析,证明了全煤巷矿井建设期应用水平机械煤仓的可行性。 Single layer and all coal heading mine can shorten the period of construction and cut down the cost and machines conveniently, but coal road heading efficiency is influenced because of its fitting conveyor. In this paper, the horizontal mechanical coal bin as buffer bin is recommended, and its technical-economic analysis is presented. It proved the horizontal mechanical coal bin in the period of constructing an all coal heading mine could achieve economic benefit obviously.
出处 《辽宁工程技术大学学报(自然科学版)》 CAS 1999年第3期225-227,共3页 Journal of Liaoning Technical University (Natural Science)
关键词 矿井建设 煤巷掘进 水平机械煤仓 矿仓 技术经济 mine constructing coal heading: horizontal mechanical coal bin
  • 相关文献

参考文献2

共引文献2

同被引文献11

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部