本文通过对糯扎渡水电站溢洪道闸墩施工期钢筋计的应力监测成果分析,阐述了施工期钢筋应力计应力变化的影响因素。通过对钢筋计的观测,能了解其周围混凝土应力变化情况,进而可分析混凝土的开裂情况。
This paper introduces the impact factor of reinfocement meter stress changes based on the analysis of monitoring reasult of reinfocement meter in spillway pier construction period in NuoZhaDu Hydropower Station.We can find out the concrete stress changes through the obervation of reinfocement meter, and we can anlysis the cracking of concrete cases.
关键词
钢筋计
应力
温度
reinforcement meter
stress
temperature