摘要
本文详细介绍了景洪水电站大坝两岸堆石坝接头方案与混凝土重力坝接头方案的比选过程,综合考虑技术和施工难度、工程投资、工程安全及施工工期等方面因素,最终将两岸混凝土重力坝接头方案作为推荐方案,并得以实施。
This paper gives an introduction on the comparison and selection about the rockfill and concrete gravity dam as dam-shoulders joint program in detail. Comprehensively considering some factors such as the difficulty of technology and construction, engineering investment and safety, and construction period, the concrete gravity dam joint program is chosen as the recommended result ultimately, and is brought into practice.
关键词
堆石坝
混凝土重力坝
接头方案
工程地质
景洪水电站
rockfill dam
concrete gravity dam
joint program
engineering geology
Jinghong Hydropower Station