摘要
对高速公路机电工程与土建工程的交叉点预留预埋设计问题进行论述,以保证土建、房建工程和机电工程设计的一致性和完整性,从而避免在施工中出现误留误埋、漏留漏埋现象。
The reservation and pre-burying of the cross point between electromechanical,civil and housing construction in expressway are discussed to ensure the consistency and completeness of the three parts,and to avoid the reservation and pre-burying errors in the construction.
出处
《交通标准化》
2010年第21期91-93,共3页
Communications Standardization
关键词
高速公路
机电工程
土建
房建
预留预埋
expressway
electromechanical engineering
civil construction
housing construction
reservation and pre-burying