摘要
岩壁吊车梁是一项新技术,目前尚无规范可循,需要在实践中不断总结、优化。主要叙述了百色水利枢纽地下厂房岩壁吊车梁的设计过程及一些问题的探讨。
The rock wall crane beam is a type of new technique and till now, there is no code yet to be followed. So it needs us to sum up and optimize continuously . This paper mainly discussed the design of RWCB in the Baise UPH and probed into some problems .
出处
《广西水利水电》
1999年第2期24-26,共3页
Guangxi Water Resources & Hydropower Engineering