摘要 TBM掘进机是目前世界上隧洞施工中最先进的掘进设备。引黄工程总干线6、7、8号隧洞已由它全线贯通,南干线长为88的4、5、6、7号隧洞也即将由其施工。本文详尽地介绍了TBM的构造、工作原理;从施工准备到掘进,衬砌、回填豆砾石及灌浆和出渣的施工过程;以及混凝土预制管片的设计与生产。讨论了TBM在引黄工程总干线6、7、8号隧洞施工过程中遇到的溶洞、土层、错台、密封等问题及解决办法,最后对TBM在不同地质情况,不同隧洞类型中的应用情况提出了自己的看法。 The double-shield and full-scale tunnel boring machine(TBM)is one of the most advanced heading equipment for the construction of tunnel in the world.Not only was it used in holing the tunnels No.6,7 and 8,of the General Main Line of the YRDP,but it is also to be used in piercing the tunnels No.4,5,6 and 7,of the South Main Line of the YRDP.The overall length of the tunnels No.6,7 and 8,of the General Main Line of the YRDP is 21 km odd.The tunnels pass mainly through limestone formation sandwiching partially the red earch,pliocene series between.Construction of these tunnels was started in August 1994 and broken through in September 1997.The maximum tunneling footage daily reaches up to 65.8 meters and monthly reaches to 1080 6 meters.In this paper,the structure and operating principle of the TBM,its construction procedure from prepartion,heading,lining,backfilling of pea gravel and grouting to spoiling,and the design and manufacture of precast concrete blocks for lining are introduced in detail.Some problems such as limestone cave,earth layer,unevenness of joints between the lining blocks and damage of air-tight seal of TBM met in the course of construction of No.6,7 and 8 tunnels in the General Main Line and the solving means are discussed.Finally,some views on the application of TBM in different geologic conditions and different types of tunnel are given.
作者 谢成泰
出处 《山西水利科技》 1999年第2期4-9,共6页 Shanxi Hydrotechnics
关键词 引黄工程 TBM 掘进机构 隧洞 施工 the YRDP TBM Structure Operating Principle Construction Procedure Problem View
  • 相关文献

同被引文献5

引证文献2

二级引证文献10

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部