期刊文献+

梯级水电站优化开发次序模型研究 被引量:2

Study on the Model of Order of Optimal Development for Cascaded Hydroelectric Power Stations
下载PDF
导出
摘要 建立了水电开发次序赋权有向图模型,将水电站优化排序这一复杂的系统分解成:梯级水电站优化补偿调节、电力电量平衡检验、电力系统折算总费用等子系统,由此再综合成总体优化模型,并提出了计算流程. The assigned right grid model for cascaded hydroelectric power stations is presented. Thecomplicated system of order of optimal development for cascaded hydroelectric power stations is decomposed into some submodels, such as compensation regulation of cascaded hydroelectric power stations, checking the balance of power generation, the total converted cost of power system, and etc.Thus, The calculation process for the synthesized general model is presented.Wu Zongfa Assoc. Professor; Hobal University, Naming 210098,China.
机构地区 河海大学
出处 《水电能源科学》 1999年第2期16-19,共4页 Water Resources and Power
关键词 梯级水电站 优化 赋权有向图 电力系统 优化排序 cascaded hydroelectric power stations optimal assigned right grid 1 model order of development
  • 相关文献

参考文献2

二级参考文献1

共引文献2

同被引文献13

  • 1夏忠,黄强,赵雪花.黄河上游梯级水电站滚动开发顺序决策分析[J].水力发电学报,2005,24(6):1-5. 被引量:6
  • 2Erlenkotter D. Sequencing of interdependent hydroelectric projects[J]. Water Resource Research, 1973, 9(1): 21 - 27.
  • 3John Kujper, Leonard Ortolano. A dynamic programming simulation strategy for the capacity expansion of hydroelectric power systems[J]. Water Resource Research, 1973, 9(6):324- 331.
  • 4Luss H. Operations research and capacity expansion problems:A survey[J]. Operations Research, 1982, 30(5): 907-947.
  • 5Erlenkotter D. Sequencing expansion projects[J]. Operations Research, 1973, 21(2): 542-553.
  • 6Erlenkotter D. Sequencing Expansion Projects[ J ]. Operations Research, 1973,21 (2) :542 -553.
  • 7Erlenkotter D. Sequencing of Interdependent Hydroelectric Projects [ J ]. Water Resource Research, 1973,9 ( 1 ) :21 - 27.
  • 8John Kujper, Leonard Ortolano. A Dynamic Programming Simulation Strategy for the Capacity Expansion of Hydroelectric Power Systems [ J ]. Water Resource Research, 1973,9 ( 6 ) :312 - 324.
  • 9Luss H. Operations Research and Capacity Expansion Problems:A Survey [ J ]. Operations Research, 1982,30 (5) :907 - 947.
  • 10陈建康.中型水电站群的开发排序[D].成都:成都科技大学,1987.

引证文献2

二级引证文献6

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部