摘要
用动态投入产出模型作为非劣电站开发顺序的区域经济系统响应的模拟分析模型;讨论了模型求解的关键技术--投资产品向量生成技术.采用层次分析法评价非劣序的区域经济系统响应之优劣,并藉此筛选最佳权衡解.
A general dynamic I/O model, which is the analysis model to simulate the regional economy system for the noninferior development sequence of power plants is proposed. And how to generate the vector of investment production, which is the key technique of dealing with dynamic I/O modelis discussed. AHP is adopted to evaluate the response of regional economy system and based on it theoptimal trade-off solution could be chosen.Luo Zhihui Ph. D.; Hunan Normal University, Changsha 410081,China.