摘要
本文通过实例列举了4种方法,说明中小型水电站工程选择建基面的方法,因所处地质环境不同,上部结构不同,以及勘察手段不同而存在差异。
It is difference that the small and medium hydropower station engieering choosing the methods of the construction foundation face according to their geological setting,upper texture and survey measure.4 kinds of the methods are listed,in this paper,basing on the engineering practice for explaining.
出处
《湖南地质》
1999年第2期150-154,共5页
Hunan Geology
关键词
坝基
岩体
利用
湖南
水电站
Dam foundation lithosome,Utilization,Hunan