1Hatt B E, Fletcher T D, Walsh C J, et al. The influence of urban density and drainage infrastructure on the concentrations and loads of pollutants in small streams [ J ]. Environ Manage ,2004,34( 1 ) : 112 - 124.
2Taylor G D, Fletcher T D, Wong T H F, et al. Nitrogen composition in urban runoff--implications for stormwater management[ J ]. Water Res, 2005,39 (10) : 1982 - 1989.
3Sazakli E, Alexopoulos A, Leotsinidis M. Rainwater harvesting, quality assessment and utilization in Kefalonia Island,Greece [ J ]. Water Res, 2007,41 ( 9 ) : 2039 - 2047.
4Egodawatta P, Thmos E, Goonetilleke A. Understanding the physical processes of pollutant build-up and wash-off on roof surfaces [ J ]. Sci Total Environ, 2009,407 ( 6 ) : 1834 - 1841.
5Charbeneau R J, Barretti M. Evaluation of methods for estimating stormwater pollutant loads[ J]. Water Environ Res, 1998,70 (7) : 1295 - 1302.
6Kim H, Seagren E A, Davis A P. Engineered bioretention for removal of nitrate from stormwater runoff [ J ].Water Environ Res,2003,75 (4) : 355 - 367.
7Bratieres K,Fletcher T D,Deletic A,et al. Nutrient and sediment removal by stormwater biofihers:A large-scale design optimisation study [ J ]. Water Res, 2008, 42 (14) :3930 - 3940.
8Davis A P, Shokouhian M, Sharma H, et al. Water quality improvement through bioretention media:nitrogen and phosphorus removal [J]. Water Environ Res, 2006,78 (3) :284 -293.
9Read J, Wevill T, Fletcher T, et al. Variation among plant species in pollutant removal from stormwater in biofiltration systems [ J ]. Water Res, 2008,42 (4 - 5 ) : 893 - 902.