摘要 针对我国高空模拟试验的应急管理,构建了一个应急管理工作流策略,并对这个策略进行了Petri网建模.这个模型主要包括应急停车程序和紧急停车程序.应急停车程序以保证被试发动机与试验设备的安全、同时兼顾快速停车为目标,所以主要由一些串行处理环节组成;而紧急停车程序则以快速停车为目标,所以以并行处理环节为主.模型的分析表明:模型具有可达性、合理性、自由选择性、良构性和S可覆盖性.根据这个模型,对某发动机在高空模拟试验时的应急管理进行了演练,获得了完成各个变迁需要的响应时间.分析这些时间数据,找到了在紧急停车程序的应急管理操作中影响整体应急响应时间的关键环节.同时发现,在应急停车程序中,可以根据应急事件的分级在保证发动机和试验设备的安全与应急响应时间之间找到一个折中,最大化应急管理的效果.应急程序的修改和应急培训有效地减少了关键环节的应急响应时间. An emergency management workflow strategy was constructed for altitude simulation testing,and a Petri net model of the strategy was modeled.The model mainly comprises an urgency stop program and a crisis stop program.The urgency stop program is aimed to ensure safety of the tested engine and the testing facilities,simultaneously,is got attention to quickly stop,so it is basically composed of some stages in series.But the crisis stop program is targeted for a quick response,therefore,its various stages is principally in parallel.By analyzing the model,it was demonstrated that the model is reachable,sound,with free choice,well-structure,and S-coverable characteristics.According to the Petri net model,an emergency management for an aero-engine in altitude simulation testing was trained,and the response time was obtained in each stage.Key stages that effect the response time of emergency management were found in the crisis stop program of emergency management operation by analyzing the time data.In the follow,it was found that maximum benefit come from a compromise between ensuring safety of tested engine,testing facilities and the response time according to emergency event level in the urgency stop program.Modified emergency program and training effectively reduced the emergency response time in the key stage.
作者 马锋 邱菀华
出处 《北京航空航天大学学报》 EI CAS CSCD 北大核心 2010年第10期1207-1212,共6页 Journal of Beijing University of Aeronautics and Astronautics
关键词 应急管理 高空模拟试验 PETRI网 工作流 建模 emergency management altitude simulation testing Petri net workflow modeling
  • 相关文献

参考文献8

  • 1杜彦华,范玉顺.扩展模糊时间工作流网的建模与仿真研究[J].计算机集成制造系统,2007,13(12):2358-2364. 被引量:3
  • 2杜鹤龄.我国大型连续式高空台与国际标准的衔接问题[J].燃气涡轮试验与研究,1995(2):7-11. 被引量:1
  • 3Madjid Tavana.Dynamic process modelling using Petri nets withapplications to nuclear power plant emergency management. Int J Simulation and Process Modelling . 2008
  • 4Jun Y,Yang I,Nam S,et al.Uncertainty analysis and improve-ment of an altitude test facility for small jet engines. AIAA-2002 -2791 . 2002
  • 5Tagashira T,Koh M,Sugiyama N.Dynamic characteristic tests ofsingle spool turbojet engine using altitude test facility. AIAA-2007 -5012 . 2007
  • 6Braig W.Transient Aeroengine Testing at Stuttgart AltitudeTest Facility. 14th International Symposium on AirBreathing Engines.ISABE 99-7074 . 1999
  • 7Kim C,Yang Y S,Lee D.An altitude test facility for small jet engines. AIAA Journal . 2001
  • 8van der Aalst WMP,van Hee KM.Workflow Management:Models,Methods,and Systems. . 2002

二级参考文献17

  • 1杜彦华,刘春煌,叶阳东.不确定性时间知识推理和验证算法及列车群建模分析[J].铁道学报,2005,27(3):1-8. 被引量:7
  • 2刘胜,范玉顺.资源约束下实例在工作流中停留时间分析方法[J].电子学报,2005,33(10):1867-1871. 被引量:11
  • 3范玉顺.工作流管理技术基础[M].北京:清华大学出版社,2001.
  • 4EDER J, PICHLER H. Probabilistic workflow management [R]. Klagenfurt, Austria: University of Klagenfurt, 2005.
  • 5VAN HEE K, REIJERS H. Using formal analysis techniques in business process redesign [C]//Proceedings of Business Process Management Models, Techniques, and Emprical Studies. Berlin, Germany: Springer-Verlag, 2000: 142-160.
  • 6LI J, FAN Y, ZHOU M. Timing constraint workflow nets for workflow analysis[J]. IEEE Transactions on Systems, Man, and Cybernetics-Part A..Systems and Humans, 2003,33(2):143-154.
  • 7ZADEH L. Fuzzy sets as a basis for a theory of possibility [J]. Fuzzy Sets and Systems, 1978, 1(1):3-28.
  • 8DUBOIS D, PRADE H. Processing fuzzy temporal knowledge[J]. IEEE Transactions on Systems, Man and Cybernetics, 1989,19(4): 729-744.
  • 9DUBOIS D, PRADE H. Possibility theory:an approach to computerized processing of uncertainty [M]. New York, N. Y. , USA:Plenum, 1988: 122-145.
  • 10ZHOU Y, MURATA T. Petri net model with fuzzy-timing and fuzzy-metric temporal logie[J]. International Journal of Intelligent Systems, 1999, 14(8):719-746.

共引文献2

同被引文献3

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部