期刊文献+

带长引水明渠的泵站控制闸门最优调节计算 被引量:1

Study of the Optimal Program for the Sluice Gate of the Pumping Station with Long Inlet Open Channel
下载PDF
导出
摘要 本文对带长引水明渠的泵站控制闸门最优调节问题进行了研究,并结合万家寨引黄工程问题进行了数值计算。计算结果表明,为尽可能减少弃水,所采用的闸门优化调节方式应使长无压输水隧洞中因闸门动作与水泵开、停机而产生的非恒定波动相互抵消,以尽快在无压隧洞中建立起明渠恒定流动。 In this paper the optimal regulation problem for the sluice gate of the pumping station with long inlet open channel was studied, and numerical calculation was also made for the regulation program of the sluice gate at Shentongzui Reservoir of Wanjiazhai Yellow River Diversion Project. It seems that to reduce the waste water the optimal program of the sluice gate should be choosen by the following way, i.e., letting the unsteady waves produced by the moving sluice gate and the pumps counteract with each other, then the steady open channel flow could be generated in the long inlet open channel as soon as possible.
出处 《水动力学研究与进展(A辑)》 CSCD 北大核心 1999年第1期16-22,共7页 Chinese Journal of Hydrodynamics
关键词 泵站 闸门 调节 控制 最优化 引水明渠 pumping station, sluice gate, regulation.
  • 相关文献

参考文献4

  • 1刘竹溪 刘光临.泵站水锤及其防护[M].北京:水利电力出版社,1989.201-240.
  • 2刘光临.万家寨引黄工程全系统水力模拟及过渡过程计算分析.武汉水利电力大学研究报告[M].,1996,10..
  • 3刘光临,武汉水利电力大学研究报告,1996年
  • 4刘竹溪,泵站水锤及其防护,1989年

共引文献2

同被引文献7

引证文献1

二级引证文献17

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部