期刊文献+

关于货车段修过程中减少整车落成后车钩高二次调整的建议 被引量:1

Suggestions for Reducing the Second Adjustment of the Height of Couplers after Completion of the Whole Car during Depot Repair of Freight Cars
下载PDF
导出
摘要 分析了铁路货车段修作业中影响车钩高调整的主要因素,提出了一种确定心盘垫厚度的新方法,以提高段修车落成车钩高一次符合率,进而提高段修车效率。 The main factors affecting the adjustment of the height of couplers during depot repair of railway freight cars are analyzed.A new method to determine the thickness of center plate pad is put forward to improve the one-time coincidence rate of coupler height after completion of the whole car during depot repair,so as to improve the efficiency of depot repair of cars.
作者 李庭红
出处 《铁道车辆》 北大核心 2010年第11期40-42,共3页 Rolling Stock
关键词 货车 段修 车钩高调整 心盘垫厚度 freight car depot repair adjustment of coupler height thickness of center plate pad
  • 相关文献

同被引文献1

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部