摘要
本文详细分析了新余钢铁公司第一炼钢厂罗可普方坯连铸机自投产以来存在的问题以及解决问题的对策。
This paper analysed in detail the problems occurring in the operation of the Rokop billet CCM at the First Steelmaking Plant, Xingyu Irom and steel Co. (XISC) and the appropriate measures to solve these problems also.
出处
《连铸》
1999年第2期37-38,共2页
Continuous Casting