摘要
针对施工阶段工程项目造价控制的重要性,从建设方的角度着手,分析了签订合同、补充协议、现场签证及索赔等对工程造价控制的影响,同时给出了相应的造价控制措施,以确保建设项目取得最大投资效益。
Aiming at the importance of the costs control for engineering program in construction stage, the paper from the aspect of the builder, analyzes the influence of the signed contract, the supplementary agreement, the field signing and claim on the engineering costs control, and provides the respective costs controlling measures, so as to ensure the maximum investment benefits for the construction programs.
出处
《山西建筑》
2010年第34期255-256,共2页
Shanxi Architecture
关键词
施工阶段
造价控制
建设方
合同
现场签证
索赔
construction stage, costs control, builder, contract, field signing, claim