在了解工程量清单计价模式的基础上,从工程前期准备阶段、实施阶段、竣工结算阶段入手,对实行工程量清单计价模式的工程造价管理工作进行了论述,并提出了自己的看法,以保证工程的顺利进行,更好地维护合同双方的利益。
Based on the engineering bill pricing model, the paper indicates to realize the engineering costs management under the engineering bill pricing model from the preparation stage of the beforehand period, the implementation stage, and the complete accounting stage, and points out own opinions, so as to ensure the smooth operation for the projects and maintain the benefits of the two sides of the contract better.