摘要
结合昆明地铁6号线新机场段工程地质水文条件,介绍了该线路关键技术方案,从线路、下穿控制建筑物、区间隧道施工方案等方面对新机场段方案进行了探讨,并得出了有益的结论,对同类工程项目具有一定指导意义。
Integrating with new airport section engineering hydrogeology conditions of Kunming subway line No. 6, this article introduces key technique scheme of this line, discusses lines, under-through controlling architectures, regional tunnel construction program and other perspectives, and obtains beneficial conclusions, which has certain guiding significance for similar engineering project.
出处
《山西建筑》
2010年第34期320-321,共2页
Shanxi Architecture
关键词
地铁
隧道
建设方案
关键技术
subway, tunnel, constructing scheme, key techniques