摘要
通过对某水库泄洪发电洞的总体概述,对泄洪发电洞施工过程中的围岩地质情况进行了工程地质评价,并根据工程地质评价提出了相应的处理措施,对工程施工起到了积极作用。
Through an overview on a reservoir releasing flood and power generating hole, this paper carries on engineering geologic evaluation in the construction process of releasing flood and power generating hole, and puts forward corresponding treatments measures according to engineering geologic assessment, which has positive effect for engineering construction.
出处
《山西建筑》
2010年第34期361-362,共2页
Shanxi Architecture
关键词
泄洪发电洞
围岩类别
工程地质评价
处理措施
releasing flood and power generating hole, surrounding rock type, engineering geologic estimation, processing measures