摘要
石横特钢厂采用以整流二级管为主体的整流桥代替直流励磁发电机改造国产龙门刨床。使用情况证明,工作台运行及抬刀电磁铁工作正常,耗电量低,两班生产年节电16396.8kW·h,可节约备件占用资金约5000元/a,且降低了维修率。
To reform planing machine made in home,using rectifier bridge,which is mainly consisted of rectifier diode,to replace of directcurrent exciter in Shiheng special steel works.The operation condition has proved that the operation of working table and clapper electromagnet are good ,saving of power is 163968kWh every year in the condition of twoshift work day system,saving of capital occupied by repair parts is 5000 yuan every year and maintenance ratio of this machine is decreased.
出处
《山东冶金》
CAS
1999年第1期30-31,共2页
Shandong Metallurgy
关键词
整流桥
二极管
直流励磁发电机
龙门刨床
rectifier bridge,directcurrent exciter, planing machine,diode