期刊文献+

面向铁钢对应的铁水调度系统研究及应用 被引量:7

Research on the Molten Iron Scheduling System Oriented to Iron-Steel Correspondence and Its Application
下载PDF
导出
摘要 在对铁水调度现状进行详细分析的基础上,依据层次化的思想探讨了面向铁钢对应的铁水调度策略,提出了基于(案例)知识、数据、模型及人机交互四维一体的组合研究方法与系统综合集成架构,详尽阐述了面向铁钢对应的铁水调度中核心问题的功能与求解方法,讨论了系统的软件结构.将研发的面向铁钢对应的铁水调度软件应用于国内某大型钢铁企业铁水生产物流过程,取得了良好的应用效果. Based on the detailed analysis of existing molten iron scheduling and the envision for hierarchical system structure,an scheduling strategy with integrated systematic framework was presented to balance the molten iron supply and steelmaking demand,where the case knowledge,data,mathematic model and man-machine interaction were all taken into account. The functions of the key problems in molten iron scheduling and the real-time solutions to them were discussed in detail,as well as the structure and function of the software system used,which has been applied successfully in a large-scale iron and steel complex in China.
出处 《东北大学学报(自然科学版)》 EI CAS CSCD 北大核心 2010年第11期1525-1529,共5页 Journal of Northeastern University(Natural Science)
基金 国家重点基础研究发展计划项目(2009CB320601) 国家高技术研究发展计划项目(2007BAE25B01) 国家科技支撑计划项目(2007AA041404 2007AA041405) 国家自然科学基金资助项目(60821063 60828007) 高等学校学科创新引智计划项目(B08015)
关键词 铁水调度系统 铁钢对应 调度策略 铁水物流平衡 静态调度 动态调度 重调度 molten iron schedule system iron-steel correspondence scheduling strategy molten iron logistics balance static scheduling dynamic scheduling rescheduling
  • 相关文献

参考文献8

  • 1龙德,么健石,徐心和.铁水运输系统智能仿真模型[J].东北大学学报(自然科学版),2005,26(6):523-526. 被引量:9
  • 2Tang L X,Guan J,Hu G F.Steel making and refining coordinated scheduling problem with waiting ti me and transportation consideration. Computers and Industrial Engineering . 2010
  • 3Atighehchian A,Bijari M,Tarkesh H.A novel hybrid algorithm for scheduling steel-making continuous casting production. Computers and Operations Research . 2009
  • 4Tang L X,Luo J X.A newILS algorithmfor cast planning problemin steel industry. ISIJ International . 2007
  • 5Bellabdaoui A,,Teghem J.A mixed-integer linear programming model for the continuous casting planning. International Journal of Production Economics . 2006
  • 6Wang G S,Tang L X.A column generation for locomotive scheduling problemin molten iron transportation. IEEE International Conference on Automation and Logistics . 2007
  • 7Tang L X,Wang GS,LiuJ Y.Abranch-and-price algorithm to solve the molten iron allocation problemin iron and steel industry. Computers and Operations Research . 2007
  • 8Missbauer H,Hauber W,Stadler W.A scheduling system for the steelmaking- continuous casting process. A case study from the steel-making industry. In- ternational Journal of Production Research . 2009

二级参考文献11

  • 1于达,张钹,陈陈.调度问题的HPN模型研究[J].计算机研究与发展,1996,33(5):321-328. 被引量:13
  • 2Chen H, Yao D D. Dynamic scheduling control of a multiclass fluid network[J].Operations Research, 1995,41(1):104-115.
  • 3Dorigo M, Gambardella L M. Ant colony system: a cooperative learning approach to the traveling salesman problem[J]. IEEE Transactions on Evolutionary Computation, 1997,1(1):53-66.
  • 4Haghan I A, Banihashem I M. Heuristic approaches for solving large scale bus transit vehicle scheduling problem with route time constraints [J]. Transportation Research, 2002,36(4):309-333.
  • 5Baita F, Pesenti R, Ukovich W. A comparison of different solution approaches to the vehicle scheduling problem in a practical case[J]. Computers & Operations Research, 2000,27(13):1249-1269.
  • 6Honkomp S J, Reklaitis G V. Robust scheduling with processing time uncertainty[J]. Computers and Chemical Engineering,1997,21(S1):1055-1060.
  • 7Rodrigues M T. Reactive scheduling approach for multi-purpose chemical batch plants[J]. Computers and Chemical Engineering, 1996,20(S1):1215-1220.
  • 8郭兰英,高一凡.一种运输车辆调度聚类分析模型及仿真研究[J].西安公路交通大学学报,1998,18(1):92-96. 被引量:7
  • 9郑汉鼎.汽车调度问题的数学模型及其解法[J].山东大学学报(理学版),1994,34(3):291-295. 被引量:6
  • 10卫军胡,韩九强,孙国基.离散事件系统仿真技术在制造系统调度中的应用[J].系统仿真学报,2000,12(1):27-30. 被引量:25

共引文献8

同被引文献131

引证文献7

二级引证文献49

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部