摘要
洛古水电站采用混合式开发方式,以发电为主,兼顾少量沿河灌溉用水等。工程枢纽区崩坡积体广布、引水洞线长,泥沙含量大,对设计来说具有一定的挑战性,本文简要介绍了洛古水电站工程主要设计成果和设计特点。
The mixed development mode is used in Luogu Hydropower Project. It is primary in power generating with some irrigation along the river. Because of the wide colluvium and diluvium, long diversion tunnel and large quantity sand, the design is challenging. The paper briefly introduces Luogn Hydropower Project' s major results and features. design