摘要
富春江水电站左岸高边坡加固工程几乎运用了目前国内外处理岩质边坡的全部方法和措施。本文简要介绍了该工程加固设计方案,对工程施工方案,主要分项工程的施工方法,特别是施工中采用的几项新技术作了详细介绍,这些技术和方法对类似工程有参考价值。
The slope harness engineering of the left bank of Fuchunjiang hydroelectric station almost adopted all present harness measures.This paper introduces the harness design scheme and new construction technology of this slope project. The measures and construction technology used in this project have important referential value to similar project.
关键词
水电站
高边坡
施工
边坡
稳定性
hydroelectric station
rock slope
construction
slashed-up joint anchor rod