摘要
结合工程实例,介绍了重型机械厂房钢吊车梁的制作工艺,并针对其中的关键技术,如正确的预热方式和预热温度、合理的焊接程序、多道焊的道间温控及"后热"保温缓冷的"去氢"措施等。
Based on project practice, working process of heavy workshop crane beam is introduced, aiming at the key technology in it, such as the right preheat method and preheat temperature, reasonable welding process, multi-pass welding of between-track temperature control and dehydrogenation measures of after heat preservation, are all detailed discussed.
出处
《工程质量》
2010年第11期30-33,共4页
Construction Quality
关键词
预热
道间温控
焊后“后热”
焊接变形控制
preheat
between track temperature control
postwelding after heat
welding deformation control