摘要
针对岩溶地区溶洞、溶沟和暗河发育,地质条件复杂多变,地基处理难度大等问题,结合某5000t/d水泥熟料生产线工程的地基处理,对施工中所采用的一些技术措施进行了对比分析,并在实践中得到检验结果表明,这些技术措施行之有效。
Aiming at problems in the karst area such as the growth of the karst cave, channeling and the underground river , with the complex and varied geological conditions, as well as difficult foundation treatment, combine with 5000t/d cement clinker product line foundation treatment construction, comparative analysis is made on some technology measures in the construction, which is also proved in the practice. Result shows that, these technologies is very useful and economically.
出处
《工程质量》
2010年第11期34-36,共3页
Construction Quality
关键词
复杂岩溶
地基处理
冲孔桩
挖孔桩
complex karst
foundation
punching pile
digging pile