摘要
对某大跨度空间钢结构体育馆施工中的结构体系转换步骤进行了全过程数值模拟,并在卸载过程中采用应变计、全站仪、GPS及加速度传感器等进行了关键点位移和杆件的内力监测。通过与数值分析结果对比说明了模拟方法的可行性,对GPS技术在大跨度空间结构施工监测中的应用进行了论述。结果可为类似结构的模拟与监测提供依据。
A numerical simulation of the structural system transformation process in construction of a long-span space structure was carried out,and instruments as strain gauge,total station,GPS and accelerometer were used to monitor the displacement and internal force during unloading stage.Through comparison between measured results and numerical analysis,the suggested simulation method was proved to be reasonable.Then the application of GPS technology in long-span space structure construction monitoring was discussed.The conclusion can provide the basis to the simulation and monitoring of similar structures.
出处
《建筑结构》
CSCD
北大核心
2010年第11期15-18,25,共5页
Building Structure
基金
上海市浦江人才计划基金"GPS在大跨空间结构健康监测中的关键技术研究"(PJ[2006]00928)
关键词
单层网壳
结构体系转换
数值模拟
监测
single-layer reticulated shell
structural system transformation
numerical simulation
monitoring