脱硫系统是发电厂极为重要的环保设施,由于脱硫系统运行异常,使烟气中携带石膏浆液对周遍环境造成了污染。本文结合国华太仓发电有限公司#8机组脱硫吸收塔改造施工工程,分析了施工中的作业风险点,提出了施工过程中过程安全管控的预防控制措施,保障工程施工安全顺利进行。
The desulphurization system is the power plant great importance the environmental protection facility, because the desulphurization systems operation is unusual, caused in the haze to carry the gypsum size to cause the pollution to all around the environment. This article unifies Guohua Taicang Power Generation Co., Ltd 8 unit desulphurization absorption tower transformation construction work, has analyzed in the construction work risk point, proposed in the construction process the process safe control's anticipatory control measure, the safeguard project construction safe carries on smoothly.
出处
《神华科技》
2010年第4期76-79,共4页
Shenhua Science and Technology
关键词
脱硫吸收塔
改造
作业风险点
Desulphurization absorption tower
Transformation Work risk point