针对项目式生产调度的模拟退火算法 被引量:1

A Simulated Annealing Algorithm for Project-Based Production Scheduling
下载PDF
导出
摘要 分析了某航空航天企业生产现状,考虑到工时不确定性,建立了数学模型。提出了模拟退火启发式算法,以此制定主动调度计划,并且结合企业生产的实际情况,进行了验证。应用实践表明,相较于单纯求解工期最短的调度计划,该算法的解能很大程度上提高计划的鲁棒性,不需要过多延长工期,对于工时可变范围大的生产项目尤其适用。 The production processes for a class of aerospace products are characterized as project-based production and processing time uncertainty.For the scheduling of such production processes,a mathematical model is developed.Based on this model,a simulated annealing heuristic is presented to obtain proactive schedules.A practical case problem is used to validate the proposed method.It shows that the schedule obtained is more robust without much delay than that obtained by methods that just minimize the makespan.This is particularly suitable for the processes that have a wide permissive completion time range.
作者 付芳 周泓
出处 《工业工程》 北大核心 2010年第5期75-79,共5页 Industrial Engineering Journal
基金 国家自然科学基金资助项目(70771003 70521001)
关键词 项目式生产 模拟退火 主动调度 project-based production simulated annealing proactive scheduling
  • 相关文献

参考文献10

  • 1Alcaraz J, Maroto C, Ruiz R. Improving the performance of genetic algorithms for the RCPS problem[ C]. Proceedings of the Ninth International Workshop on Project Management and Scheduling, Nancy, 2004 : 40 -43.
  • 2Debels D, DE Reyck B, Leas R, et al. A hybrid scatter search/Electromagnetism meta-heuristic for project scheduling[ J ]. European Journal of Operational Research, 2006, 169:638-.653.
  • 3Hartmann S: A self-adapting genetic algorithm for project scheduling under resource constraints [ J ]. Naval Research Logistics, 2002,49:433-448.
  • 4Zhu G, Bard J, Yu G. Disruption management for resourceconstrained project scheduling[ J]. Journal of the Operational Research Society,2005,56:365-381.
  • 5Herroelen W, Leus R. Project scheduling under uncertaintySurvey and research potentials [ J ]. European Journal of Operational Research ,2005,165:289-306.
  • 6Van de Vonder S, Demeulemeester E,Herroelen W. A classification of predictive-reactive project scheduling procedures [ J ]. Journal of Scheduling ,2007,10 : 195-207.
  • 7Van de Vonder S, Demeulemeester E, Herroelen W, et al. The trade-off between stability and makespan in resource-constrained project seheduling[ J ]. International Journal of Production Research,2006,44(2) :215-236.
  • 8Van de Vonder S, Demeulemeester E, Herroelen. Proactive heuristic procedures for robust project scheduling:An experimental analysis [ J ]. European Journal of Operational Research ,2008,189 ( 3 ) :723-733.
  • 9Lambrechts O, Demeulemeester E, Herroelen W. A tabu search procedure for developing robust predictive project schedules [ J ]. International Journal of Production Economics ,2008,111:493-508.
  • 10Vails V, Ballestin F, Quintanilla M, A hybrid genetic algorithm for the trained project scheduling problem [ J ]. European Journal of Operational Research, 2008, 185 ( 2 ) :495-508.

同被引文献73

  • 1边志兴.作业车间的模糊动态调度问题研究[J].中国管理科学,2008,16(S1):76-83. 被引量:3
  • 2刘士新,宋健海,唐加福.资源受限项目调度中缓冲区的设定方法[J].系统工程学报,2006,21(4):381-386. 被引量:70
  • 3马国丰,尤建新.关键链项目群进度管理的定量分析[J].系统工程理论与实践,2007,27(9):54-60. 被引量:50
  • 4Brucker P, Drexl A, Mohring R, et al. Resource-constrained project scheduling: Notation, classification, models and methods[J]. European Journal of Operational Research, 1999, 112(1): 3-41.
  • 5Herroelen W, De Reyck B, Demeulemeester E. Resource constrained scheduling: A survey of recent developments[J]. Computers and Operations Research, 1998, 25(4): 279-302.
  • 6Demeulemeester E, Herroelen W. Project Scheduling: A Research Handbook[M]. Boston, London: Kluwer Academic Publishers, 2002.
  • 7Zhu G, Bard J, Yu G. Disruption management for resource constrained project scheduling[J]. Journal of the Operation Research Society, 2005, 56(4): 365-381.
  • 8Wang J. Constraint-based schedule repair for product development projects with time-limited constraints[J]. International Journal of Production Economics, 2005, 95(3): 399-414.
  • 9Herroelen W, Leus R. Project scheduling under uncertainty: Survey and research potentials[J]. European Journal of Operational Research, 2005, 165(2): 289-306.
  • 10Demeulemeester E, Herroelen W. Introduction to the special issue: Project scheduling under uncertainty[J]. Journal of Scheduling, 2007, 10(3): 151-152.

引证文献1

二级引证文献22

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部