期刊文献+

论抵御’98洪水与洪水风险管理 被引量:1

A View from '98 Flood: from Flood Control to Disaster Risk Management
下载PDF
导出
摘要 1998年长江流域发生了自1954年以来又一次全流域性大洪水,嫩江和松花江流域也发生了超历史记录的特大洪水.从抵御’98洪水中得出,必须改变单纯的抵御洪水的观念,要对洪水实行全过程风险管理.进行洪水风险管理,最主要的是制定针对洪水灾害的政策.并进一步分析了蓄滞洪区的管理,应加强以下几方面的建设:(1)控制和减少人口;(2)加强安全设施建设;(3)绘制洪水风险留,建立和完善避难的预报和预警系统;(4)建设分蓄洪控制工程;(5)严格土地利用规划及管理,调整产业结构;(6)实行洪水保险制度. The Yangtze River great flood of 1998 was truly the greatest flood disaster since 1954, while Nejiang River and Songhua River flood as the greatest one in history- From '98 flood, we found again that we should change our concern from flood control only to flood disaster risk management- It is very important to es-tablish a good policy system in flood risk management. Taking the management of flood detention area as an example, the main tasks are: (1) population control; (2) safety measures; (3) hazard map; (4) flood control works; (5) land use planning; (6) flood disaster insurance.
机构地区 清华大学
出处 《水利水电技术》 CSCD 北大核心 1999年第5期3-5,共3页 Water Resources and Hydropower Engineering
关键词 洪水 洪水灾害 洪水风险管理 防洪 great flood of 1998, f1ood disaster, flood risk management
  • 相关文献

参考文献3

  • 1华家鹏,李国芳,周毅.洪水保险研究[J].水科学进展,1997,8(3):226-232. 被引量:30
  • 2华家鹏,水科学进展,1997年,8卷,3期
  • 3顾浩,中国治水史鉴,1997年

共引文献29

同被引文献11

引证文献1

二级引证文献20

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部