摘要
介绍了30000 m3转炉煤气柜的年度大修工作,重点阐述了在大修工作中对转炉煤气回收及输出系统的技术改造工作。
The year overhaul work of 30000 m3 converter gas holder was introduced.The technical reconstruction of converter gas recovery and the output system in the overhaul work were set forth.
出处
《冶金动力》
2010年第6期53-54,62,共3页
Metallurgical Power
关键词
转炉煤气柜
大修
技术改造
converter gas holder
overhaul
technical reconstruction