摘要
为提高闪速炉冶炼能力,金隆公司根据生产实践,结合仿真和模型技术研究成果,对闪速炉反应塔和精矿喷嘴进行了优化设计和改造,取得良好效果,闪速炉生产能力大幅提高。
In order to increase the productive capacity of flash smelting furnace,Jinlong Copper Co.,Ltd made design optimization and reconstruction to the reaction shaft and concentrate burner of flash smelting furnace with imitation and modeling technologies and acquired good result,greatly increasing the productive capacity of flash smelting furnace.
出处
《有色冶金设计与研究》
2010年第6期17-20,共4页
Nonferrous Metals Engineering & Research
关键词
反应塔
精矿喷嘴
精矿处理量
reaction shaft
concentrate burner
concentrate processing capacity