4Loyd East.Application of New Fracturing Technique Improves Stimulation Success for Openhole Horizontal Completions[J].SPE 86480.2004.
5Surjaatmadja J B.Effective Stimulation of Multilateral Completions in the James Lime Formation Achieved by Controlled Individual Placement of Numerous Hydraulic Fractures[J].SPE 82212.2003.
6Machiel Butter.The Potential of Multiple Fractured Horizontal Wells in Layered Reservoirs[J].SPE 102633.2006.
7EastL.Packerless Multistage Fracture-Stimulation Method Using CT Perforating and Annular Path Pumping[J].SPE 96732.2005.
8Surjaatmadja J B.Unconventional Multiple Fracture Treatments Using Dynamic Diversion And Downhole Mixing.SPE 77905.2002.
4Surjaatmadja J B. Effective stimulation of multilateral com- pletions in the james lime formation achieved by controlled individual placement of numerouo hydraulic fractures [J]. SPE 82212. 2003.