期刊文献+

安宁市白塔桥整体同步降落施工工艺

Integral Landing Construction of BaiTa Bridge in Anning City
下载PDF
导出
摘要 为配合云南螳川西路景观大道的改造建设,对沿线白塔桥采用整体顶升方式同步降落3.06 m。介绍了液压顶升系统工作原理、支撑结构的组成形式、结构降落过程及施工监控等相关内容,该方案的成功实施为此类工程难题的解决积累了宝贵经验。 To fulfill the traffic development plan of the TanChuanXi Road,it is necessary to upgrade the BaiTa Bridge along the road,which is required to be landed by 3.06 m using integral landing methods.In this paper the operation principles of the hydraulic jack system,the composition of the supporting structures,the landing process of the bridge as well as construction inspection are introduced detailed.The experience gain in this case can be taken for reference by the similar engineering projects.
出处 《公路工程》 2010年第5期107-111,共5页 Highway Engineering
关键词 T型梁桥 整体降落 顶升 施工 监测 T beam bridge integral landing lifting construction monitoring
  • 相关文献

参考文献7

二级参考文献16

共引文献84

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部