顺溪拱坝溢流消能布置模型试验研究 被引量:2

Study of model test on overflow energy dissipation layout of Shunxi arch dam
下载PDF
导出
摘要 顺溪拱坝为抛物线型常态混凝土双曲变厚拱坝,针对其水头落差大所带来的坝下消能防冲问题,对原设计方案进行改进。原设计方案表孔水舌直接砸击下游左侧护坡及河道底,且水舌落地后向四周折射,不仅对设计护坡的稳定性构成危险,而且势必威胁坝肩的稳定。通过水工模型试验方案比较,优化了溢流堰的平面布置和中孔出口体型,推荐了二道坝方案,改善了溢流堰进口及坝下水流流态,明显减轻了水流对坝下河床的冲刷,为设计提供了技术依据,成果可供类似工程参考。 Shunxi arch dam is a normal hyperbolic thickening concrete arch dam with high water head and serious energy dissipation problem.In the original design scheme,the water-jets coming out of the surface hole directly strikes the left slope and river bottom in the downstream of the dam and all-round refraction occurs.It threatens the stability of designed slope and the abutment.Through comparison of different schemes by hydraulic model test,we optimize the layout of the overflow weir horizontal location and the exit shape of middle hole,and recommend the subsidiary dam proposals.It improves the flow pattern of imports and downstream of the dam,and significantly reduces water erosion of the river bed.The results provide a technical basis for the design process.
出处 《人民长江》 北大核心 2010年第21期62-65,共4页 Yangtze River
关键词 溢流拱坝 二道坝 消能防冲 试验研究 顺溪水电站 arch dam subsidiary dam energy dissipation hydraulic model test Shunxi arch dam
  • 相关文献

参考文献5

二级参考文献5

  • 1雅碧江锦屏一级水电站坝址选择研究报告(工程地质条件篇).成都勘测设计研究院.2001.3.
  • 2雅碧江锦屏一级水电站可行性研究报告成都勘测设计研究院.2003.9.
  • 3富马加利·E著,蒋彭年,彭光履,赵欣译.静力模型与地质力学模型.北京:水利电力出版社,1979.
  • 4任自明,沈泰.三峡工程坝基岩体工程研究.北京:中国地质大学出版社.1998.
  • 5姜小兰,陈进,孙绍文,李宁.锦屏工程地质力学模型坝基岩体新型材料研究[J].长江科学院院报,2009,26(6):40-43. 被引量:11

共引文献10

同被引文献18

引证文献2

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部