1IAEA.Human Reliability Analysis in Probabilistic Safety Assessment for Nuclear Power Plants,A Safety Practice [R].IAEA Safety Series No.50-P-10,1995.
2Nuclear Energy Agency,Critical Operator Actions:Human Reliability Modeling and Data Issues [R].NEA/CSNI/R(98)1,1998.227-236.
3Werner W F,Hirano M,Kondo S,et al.Results and insights from level-1 probabilistic safety assessments for nuclear power plants in France,Germany,Japan,Sweden,Switzerland and the United States [J].Reliability Eng and Syst Safety,1995,48:165-179.
4广东核电合营有限公司.岭奥核电站PSA报告 [R].广东核电合营有限公司,2000.Guangdong Nuclear Power Joint Venture Company LTD.PSA Report of Ling'ao Nuclear Power Plant [R].Guangdong Nuclear Power Joint Venture Company LTD,2000.(in Chinese)
5Borst M V,Schoonakker H.An overview of PSA importance measures [J].Reliability Eng and Syst Safety,2001,72:241-245.
6Youngblood R W.Risk significance and safety significance [J].Reliability Eng and Syst Safety,2001,73:121-136.
7Virginia Electric and Power Company.Probabilistic Risk Assessment for the Individual Plant Examination Final Report North Anna Power Station Units 1 and 2 [R].Virginia Electric and Power Company,1992.
8Neville Stanton. Human Factors in Nuclear Safety[M].London: Taylor&Francis Ltd, 1996.
9Hollnagel E. Reliability analysis and operator modeling[J]. Reliability Engineering&System Safety, 1996,52:327-337.
10Kim I S. Human reliability analysis in the man-machine interface design review[J]. Annals of Nuclear Energy,2001, 28z:1069-1081.