摘要
码头工程方案的选择除了其结构形式以外,很大程度上取决于工程造价的高低。根据漳州港古雷港区地形、地质、水文等自然条件,结合整个港区的规划,对漳州港古雷港区南#10,#11泊位项目港工建筑物提出了两个方案,并对其进行技术分析及经济比选,从而综合确定推荐方案。
The selection of the wharf engineering scheme depends to a great extent on the engineering cost besides the structure type.According to the natural conditions of Zhangzhou Port including the topography,geology and hydrology,combining with the general planning of the port,we propose two schemes for the port buildings of Zhangzhou port berths No.10 No.11,and carry out the technical analysis and economic comparison between them,so as to determine comprehensively the recommended scheme.
出处
《水运工程》
北大核心
2010年第11期58-62,共5页
Port & Waterway Engineering
关键词
重力式沉箱岸壁结构
卸荷板
技术分析
经济比较
gravity-caisson quay wall structure
relieving plate
technological analysis
economic comparison