摘要
通过对二段净化渣浸出锌的试验研究,探索出了二段净化渣处理的最佳工艺技术控制条件。
An optimum process control condition for treating the two\|stage purified residue has
been found out through the experimental study of the leaching out zinc by the two\|stage purified
residue,and a satisfactory result has been obtained in practical production.
出处
《环境工程》
CAS
CSCD
北大核心
1999年第3期46-46,共1页
Environmental Engineering