摘要
以湖州市1号污水泵站施工为背景,介绍了顶管技术在其中的应用,简单概述了工具管的选型、工作井布置以及顶力计算等,详细分析了顶管施工技术措施以及关键控制点,以达到完善顶管施工技术的目的。
Taking Huzhou city No. 1 wastewater pumping station construction as the background, this paper describes the application on pipe jacking technology, simply overviews the type selection of tools pipe, working hell layout, and jacking force calculation .and so on, and then specifically analyzes the technical measures of pipe jacking construction and key controlling points, so as to perfect the pipe jacking construction technology.