浅谈供油工程项目的实施管理 被引量:1

Tentative discussion on implementation management of petroleum supply engineering project
下载PDF
导出
摘要 结合多年供油工程项目建设工作实践经验,提出了实施阶段有待优化的管理内容,从现场工程质量控制、工程进度管理和全面成本控制等方面出发,探讨分析了业主在工程项目实施阶段的管理重点。针对工程项目现场管理问题和不足,提出了优化现场管理的主要内容,并将其运用在实际的工程项目管理中,提高了工程管理质量和效率。 Integrating with many years' practical construction experience in petroleum supply engineering project, this paper holds that management content is to be awaited to optimize at implementation phase. Starting from aspects of site engineering quality control, engineering schedule management and total cost control etc. , it discusses the management points for project owners at engineering project implementation phase. In light of problems and shortcomings of engineering project site management, it puts forward main content for optimizing site management, and ap- plies it into actual engineering project management, finally improves the engineering management quality and efficiency.
作者 张奂欧
出处 《山西建筑》 2010年第35期182-183,共2页 Shanxi Architecture
关键词 供油工程 质量控制 全面成本控制 进度控制 petroleum supply engineering, quality control, total cost control, schedule control
  • 相关文献

参考文献3

二级参考文献4

共引文献15

同被引文献5

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部