摘要
太钢发电厂将现有抽汽式冷凝发电机组改造成低真空运行供应热水采暖。由于结合实际采取了有效的改造措施,取得了较好的运行效果.
Existing exhaust condensation generators of the heat power plant of Taiyuan Iron & Steel Co. were reformed to low vacuum operation to supply hot water for heating. It has obtained better operation effects by using practical and ef- fective measures.
出处
《冶金动力》
1999年第1期5-11,共7页
Metallurgical Power