摘要
是否能在大中型汽轮发电机组低负荷运行或启、停过程中摒除现有辅助锅炉,是目前电厂建设和运行中十分感兴趣的课题,本文就STC首台P-DPT-125型减温减压装置的设计原理、系统匹配及其在舟山电厂的处女运行作简单的介绍。
In power plant construction and operation,it is a current interesting subject whether it is possible to discard existing auxiliary boiler during the process of low load operation,startup or shutdown of large & medium sized steam turbine generator unit. The article describes in brief the design principle of first set P DPT125 temperature & pressure reducing device made by STC and its system match as well as its premier operation in Zhoushan Plant.
出处
《上海汽轮机》
1999年第2期1-5,共5页
Shanghai Turbine
关键词
减温减压装置
辅助锅炉
低负荷
汽轮发电机组
temperature & pressure reducing device
auxiliary boiler
low load operation