摘要
介绍了京沪高铁天津特大桥底座板单元划分方法及纵联工艺,重点阐述了纵联过程中的顺序步骤及操作要点。
Unit division method and longitudinal connection technique of base plates in Beijing-Shanghai High-speed Railway extra-large bridge are introduced in this paper,with focuses on steps and operational points in longitudinal connection process.
出处
《铁道建筑技术》
2010年第11期4-6,共3页
Railway Construction Technology
关键词
无砟轨道
底座板
单元划分
临时端刺
常规区
ballastless track
base plate
unit division
temporary terminal spine
conventional area