摘要
结合广州客站内京广线K2265+759.28处1×6.0 m某公交化地道的施工实例,针对该工程所处的特殊地理位置和复杂的外界干扰因素,就如何克服施工中的技术难题,以及实施可行的施工方案来介绍在旅客站场内铁路营业线下长地道施工技术及组织要点,可作为类似工程施工参考。
Through construction technical management of 1×6.0 m Guangzhou-Shenzhen public transit subway in Beijing-Guangzhou Railway K2265 +759.28 at Guangzhou Railway Station,and in targeting at project' s special geographical position and complex external interference factors,how to overcome technical difficulties in construction and have a feasible engineering scheme,this paper introduces and summarizes construction technologies and organizational points for long tunnels in passenger station railway operation line,which can be reference to similar projects.
出处
《铁道建筑技术》
2010年第11期84-88,共5页
Railway Construction Technology
关键词
铁路站场
雨棚柱加固
运输安全
railway station
canopy pillar reinforcement
safety of railway operation line