上海地铁“十”形换乘地铁车站施工技术 被引量:3

Construction Technique of Shanghai Metro "Cross-shape" Interchange Station
下载PDF
导出
摘要 上海轨道交通9号线西藏南路站和8号线陆家浜车站是典型的"十字"换乘段车站,9号线西藏南路站在施工过程中遇到了地面建筑密集、交通设施繁忙、地下管线众多、地下水位高等难题。该文阐述了典型"十"形换乘地铁车站施工技术,很好地解决了基坑在开挖过程中存在的诸多困难。使用该技术施工,有效地控制了基坑的变形,确保了交通干道的畅通及周边建筑物的安全。 Shanghai Metro No.9 Line Xizang Road (S) Station and No.8 Line Lujiabang Road Station are the typical 'cross-shape' interchange stations. The difficulties of the dense ground buildings,heavy traffic facilities,many underground pipelines and high underground water level occurred in the construction of No.9 Line Xizang Road (S) Station. The article sets forth the typical 'cross-shape' interchange metro station construction technique,and better resolves many difficulties existing in the excavation of the foundation pit. This technical construction is used effectively to control the deformation of the pit and ensure the smoothness of the trunk traffic and the safety of the surrounding buildings.
作者 卿凇
出处 《城市道桥与防洪》 2010年第10期124-127,139,共5页 Urban Roads Bridges & Flood Control
关键词 地铁车站 十字换乘 双侧便桥 框架逆作 对称开挖 施工监测 metro station,cross-shape interchange,double-side bypass,frame top-down construction,symmetrical excavation,construction monitor
  • 相关文献

同被引文献17

引证文献3

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部